AcuComm Waste Business Finder

Search

Instant MarketView

Click on the chart segments to display more information and a link to the projects that make up that segment.

Value in US$ (millions)

Year Q1 Q2 Q3 Q4
20190400134
202039309242271
2021329112326648
202283619474573732
20235200137
Year Total
2019US$ 174 (millions)
2020US$ 861 (millions)
2021US$ 1415 (millions)
2022US$ 6971 (millions)
2023US$ 189 (millions)

This graph shows the reported/estimated US$ value of investments reported for the search criteria, by the quarter their associated projects are expected to become operational. This allows you to get an idea of the value of investments, and also the typical time taken for the given project type to reach operational status.

Project Completion Dates

Year Q1 Q2 Q3 Q4
20190302
20201259
2021710911
20221822545
20231001
Year Total
20195
202017
202137
202290
20232

This graph shows the reported or anticipated operational date for the selected projects. The bars refer to the number of projects/investments made, and the quarter in which they are due to become operational.

Plant Handling Capacity

Handling Capacity Total
< 50K tonnes 31
< 200K tonnes 47
> 200K tonnes 122

This graph shows the reported/estimated feedstock capacity on the selected projects, split by broad size. There are three groups: Less than 50,000 tonnes per year, 50,000-200,000 tonnes per year, and more than 200,000 tonnes per year. This allows you to see the typical size of projects in a given sector, by size of waste/feedstock throughput.

Output Power (MW)

Output Power (MW) Total
< 5 MW 6
< 40 MW 134
> 40 MW 9

This graph does the same job as the 'Plant Handling Capacity' chart, but for planned power generation for the selected project group. There are three groups: Less than 5 MW, 5 MW –40 MW, and more than 40 MW. This allows you to see the typical size of projects in a given sector, by planned/estimated power generation.

Project Search Results for China Everbright International

200 results found including 439 contacts.

Download

This Download export feature is only available with a yearly subscription.
Subscribe now

Buy Now

You can buy these projects now for £1060.00 / €1325.00 / $1611.20

  1. China - WtE Facility

    Updated 17 April 2019

    Summary: Construction of a 365,000 tpa WtE facility.

  2. China - Landfill

    Updated 08 April 2019

    Summary: Construction of a landfill and leachate pool.

  3. China - Landfill

    Updated 28 March 2019

    Summary: Development of a hazardous waste landfill.

  4. China - WtE Plant

    Updated 21 March 2019

    Summary: Redevelopment and expansion of WtE facility.

  5. China - WtE Facility

    Updated 21 March 2019

    Summary: Phase II of the development of a 900 tpd WtE facility.

  6. China - Leachate Treatment Plant

    Updated 20 March 2019

    Summary: Development of a leachate treatment plant.

  7. China - WtE Facility

    Updated 18 March 2019

    Summary: Construction of a 1,200 tpd WtE facility.

  8. China - WtE Facility

    Updated 06 March 2019

    Summary: Construction of a 1,200 tpd WtE facility.

  9. China - WtE Facility

    Updated 04 March 2019

    Summary: Expansion of a WtE facility.

  10. China - Waste Treatment Plant

    Updated 20 February 2019

    Summary: Construction of a 200 tpd food waste treatment plant.

  11. China - WtE Facility

    Updated 13 February 2019

    Summary: Construction of a 25 MW WtE facility.

  12. China - WtE Facility

    Updated 13 February 2019

    Summary: Construction of a 27 MW WtE facility.

  13. China - WtE Facility

    Updated 06 February 2019

    Summary: Construction of a 1,000 tpd WtE facility.

  14. China - Waste Treatment Plant

    Updated 05 February 2019

    Summary: Construction of a hazardous waste treatment plant.

  15. China - Waste Treatment Plant

    Updated 30 January 2019

    Summary: Construction of a food waste treatment plant.

  16. China - Waste Treatment Plant

    Updated 30 January 2019

    Summary: Construction of a food waste treatment plant.

  17. China - Biomass Plant

    Updated 17 January 2019

    Summary: Construction of a biomass plant.

  18. China - Biomass Plant

    Updated 17 January 2019

    Summary: Construction of a biomass plant.

  19. China - Biomass Plant

    Updated 17 January 2019

    Summary: Construction of a biomass CHP plant.

  20. China - Biomass Plant

    Updated 17 January 2019

    Summary: Construction of a biomass CHP plant.

  21. China - WtE Facility

    Updated 15 January 2019

    Summary: Construction of a 600 tpd WtE facility.

  22. China - Landfill

    Updated 08 January 2019

    Summary: Development of a landfill to receive fly ash.

  23. China - Waste Treatment Facility

    Updated 02 January 2019

    Summary: Construction of a leachate treatment facility.

  24. China - WtE Facility

    Updated 02 January 2019

    Summary: Construction of a 1,050 tpd WtE facility.

  25. China - Biomass Plant

    Updated 21 December 2018

    Summary: Construction of a 300,000 tpa biomass power plant.

  26. China - WtE Facility

    Updated 21 December 2018

    Summary: Construction of a 400 tpd WtE plant.

  27. China - WtE Facility

    Updated 20 December 2018

    Summary: Construction of a WtE facility - Phase III.

  28. Vietnam - WtE Plant

    Updated 17 December 2018

    Summary: Construction of a 7.5 MW WtE plant.

  29. China - WtE Facility

    Updated 13 December 2018

    Summary: Construction of a 3,000 tpd WtE facility and leachate treatment station.

  30. China - Waste Treatment Plant

    Updated 13 December 2018

    Summary: Construction of a food waste treatment plant.

  31. China - WtE Facility

    Updated 22 November 2018

    Summary: Development of a 800 tpd WtE facility.

  32. Philippines - WtE Facility

    Updated 20 November 2018

    Summary: Development of a WtE facility.

  33. China - WtE Plant

    Updated 06 November 2018

    Summary: Construction of a WtE facility with asssociated landfill and leachate treatment plant.

  34. China - Waste Disposal Plant

    Updated 06 November 2018

    Summary: Construction of a kitchen waste disposal plant.

  35. China - Waste Treatment Plant

    Updated 06 November 2018

    Summary: Construction of a sewage waste treatment plant.

  36. China - Sludge Treatment Facility

    Updated 26 October 2018

    Summary: Development of a 70 tpd sludge treatment facility.

  37. China - WtE Facility

    Updated 24 October 2018

    Summary: Construction of a 25 MW WtE facility.

  38. China - WtE Facility

    Updated 22 October 2018

    Summary: Construction of a 12 MW WtE facility.

  39. China - WtE Facility

    Updated 22 October 2018

    Summary: Construction of a 12 MW WtE facility.

  40. China - WtE Facility

    Updated 19 October 2018

    Summary: Development of a 45 MW WtE facility.

  41. China - WtE Facility

    Updated 19 October 2018

    Summary: Construction of a 50 MW WtE facility.

  42. China - WtE Facility

    Updated 18 October 2018

    Summary: Construction of a 750 tpd WtE plant.

  43. China - Waste Treatment Facility

    Updated 17 October 2018

    Summary: Development of a food waste treatment plant.

  44. China - WtE Facility

    Updated 16 October 2018

    Summary: Phase II of the construction of a 328,500 tpa WtE facility.

  45. China - Landfill

    Updated 10 October 2018

    Summary: Development of leachate treatment facility.

  46. China - Landfill

    Updated 10 October 2018

    Summary: Development of leachate treatment facility.

  47. China - WtE Facility

    Updated 09 October 2018

    Summary: Construction of a 1,500 tpd WtE facility.

  48. China - WtE Facility

    Updated 12 September 2018

    Summary: Construction of a 50 MW WtE plant.

  49. China - Sludge Treatment Plant

    Updated 10 September 2018

    Summary: Development of a wastewater sludge treatment plant.

  50. China - Hazardous Waste Facility

    Updated 23 August 2018

    Summary: Construction of a 90,000 tpa hazardous waste treatment facility.

  51. China - Landfill

    Updated 23 August 2018

    Summary: Construction of a hazardous waste landfill.

  52. Ethiopia - WtE Plant

    Updated 20 August 2018

    Summary: Construction of a waste-to-energy plant.

  53. China - WtE Facility

    Updated 13 August 2018

    Summary: Dismantling, redevelopment and upgrading of WtE facility.

  54. China - Biomass Plant

    Updated 07 August 2018

    Summary: Construction of a 300,000 tpa biomass CHP plant.

  55. China - WtE Plant

    Updated 07 August 2018

    Summary: Construction of a 400 tpd WtE facility.

  56. China - Hazardous Waste Treatment Facility

    Updated 06 August 2018

    Summary: Construction of a hazardous solid waste treatment facility.

  57. China - WtE Facility

    Updated 03 August 2018

    Summary: Phase II of the construction of a household WtE facility.

  58. China - WtE Facility

    Updated 25 July 2018

    Summary: Development of a 15 MW WtE facility.

  59. China - Waste Processing Facility

    Updated 23 July 2018

    Summary: Construction of a food waste processing facility.

  60. China - Waste Processing Facility

    Updated 23 July 2018

    Summary: Construction of a food waste processing facility.

  61. China - WtE & Biomass Facility

    Updated 19 July 2018

    Summary: Development of a WtE and biomass facility.

  62. China - WtE Facility

    Updated 09 July 2018

    Summary: Construction of an 800 tpd WtE facility.

  63. China - WtE Plant

    Updated 09 July 2018

    Summary: Construction of a 400 tpd WtE facility.

  64. China - WtE & Biomass Facility

    Updated 12 June 2018

    Summary: Construction of a waste-to-energy and biomass facility.

  65. China - Hazardous Waste Incineration Facility

    Updated 11 June 2018

    Summary: Construction of a hazardous waste incineration facility.

  66. China - WtE Plant

    Updated 16 May 2018

    Summary: Development of a 1,050 tpd WtE plant.

  67. China - WtE Facility

    Updated 01 May 2018

    Summary: Construction of a 1,400 tpd WtE facility.

  68. China - WtE Facility

    Updated 27 April 2018

    Summary: Construction of a 1,500 tpd WtE facility.

  69. China - WtE Facility

    Updated 26 April 2018

    Summary: Construction of a 1,500 tpd WtE facility.

  70. China - WtE Facility

    Updated 13 April 2018

    Summary: Construction of a 25 MW WtE facility.

  71. China - WtE Plant

    Updated 27 March 2018

    Summary: Construction of a 400 tpd WtE plant.

  72. China - Biomass Plant

    Updated 27 March 2018

    Summary: Construction of a 280,000 tpa biomass plant.

  73. China - Biomass Plant

    Updated 27 March 2018

    Summary: Construction of a 30 MW biomass plant.

  74. China - Landfill

    Updated 19 March 2018

    Summary: Construction of a hazardous waste landfill.

  75. China - Waste Treatment Facility

    Updated 19 March 2018

    Summary: Construction of an industrial and hazardous waste facility.

  76. China - Biomass Plant

    Updated 25 January 2018

    Summary: Construction of a 300,000 tpa biomass plant.

  77. China - Biomass Facility

    Updated 29 December 2017

    Summary: Development of a biomass facility.

  78. China - WtE Facility

    Updated 27 December 2017

    Summary: Construction of a 1,000 tpd WtE facility.

  79. China - WtE Facility

    Updated 22 December 2017

    Summary: Construction of a 400 tpd WtE facility.

  80. China - Biomass Plant

    Updated 22 December 2017

    Summary: Construction of a 300,000 tpa biomass plant.

  81. China - Waste Treatment Facility

    Updated 19 December 2017

    Summary: Development of a 30,000 tpa hazardous waste treatment facility.

  82. China – Biomass Plant

    Updated 15 December 2017

    Summary: Construction of a 30 MW biomass plant.

  83. China - Hazardous Waste Treatment Plant

    Updated 15 December 2017

    Summary: Construction of a 40,000 tpa hazardous waste facility.

  84. China - WtE Facility

    Updated 14 December 2017

    Summary: Construction of a 1,500 tpd WtE facility.

  85. China - WtE Facility

    Updated 12 December 2017

    Summary: Construction of a 20 MW WtE facility.

  86. China - WtE Facility

    Updated 12 December 2017

    Summary: Construction of a 1,500 tpd WtE facility.

  87. China - WtE Facility

    Updated 11 December 2017

    Summary: Construction of a 292,000 tpa WtE facility.

  88. China - WtE Facility

    Updated 08 December 2017

    Summary: Phase I of an 800 tpd WtE facility.

  89. China - WtE Facility

    Updated 08 December 2017

    Summary: Upgrading of a 2,000 tpd WtE facility.

  90. China - WtE Facility

    Updated 04 December 2017

    Summary: Construction of a 3,000 tpd WtE facility.

  91. China - Waste Treatment Facility

    Updated 24 November 2017

    Summary: Construction of a sludge treatment & disposal plant.

  92. China - WtE Facility

    Updated 06 November 2017

    Summary: Construction of a 400 tpd WtE facility.

  93. China - Biomass Facility

    Updated 06 November 2017

    Summary: Construction of a 300,000 tpa biomass plant.

  94. China - Hazardous Waste Treatment Facility

    Updated 03 November 2017

    Summary: Development of a 40,000 tpa hazardous waste treatment facility.

  95. China - WtE Facility

    Updated 23 October 2017

    Summary: Phase II development of a WtE facility.

  96. China - WtE Facility

    Updated 23 October 2017

    Summary: Construction of a 1.1 million tpa WtE facility.

  97. China - WtE Plant

    Updated 18 October 2017

    Summary: Phase II of a WtE facility.

  98. China - Waste Treatment Park

    Updated 27 September 2017

    Summary: Construction of a multi-facility waste treatment park.

  99. China - WtE Facility

    Updated 20 September 2017

    Summary: Construction of an 18 MW WtE facility.

  100. China - Waste Treatment Plant

    Updated 20 September 2017

    Summary: Construction of a food waste treatment plant.

  101. China - Biomass Facility

    Updated 18 September 2017

    Summary: Construction of a 300,000 tpa biomass plant.

  102. China - Landfill

    Updated 13 September 2017

    Summary: Development of a hazardous waste landfill.

  103. China - WtE Facility

    Updated 30 August 2017

    Summary: Construction of a 547,500 tpa WtE facility.

  104. China - WtE Facility

    Updated 11 August 2017

    Summary: Construction of a 12 MW WtE facility.

  105. China - WtE Facility

    Updated 11 August 2017

    Summary: Construction of an 800 tpd WtE facility.

  106. China - WtE Facility

    Updated 11 August 2017

    Summary: Phase II development of a WtE facility.

  107. China - WtE Facility

    Updated 01 August 2017

    Summary: Construction of a 292,000 tpa WtE facility.

  108. China - WtE Plant

    Updated 27 July 2017

    Summary: Phase I of the development of a WtE facility.

  109. China - WtE Facility

    Updated 20 July 2017

    Summary: Construction of a 36 MW WtE plant.

  110. China - WtE Facility

    Updated 17 July 2017

    Summary: Construction of a WtE facility.

  111. China - Landfill

    Updated 13 July 2017

    Summary: Development of a hazardous waste landfill.

  112. China - Biomass Plant

    Updated 12 July 2017

    Summary: Construction of a 300,000 tpa biomass plant.

  113. China - WtE Facility

    Updated 11 July 2017

    Summary: Construction of a 500 tpd WtE plant.

  114. China - WtE Facility

    Updated 10 July 2017

    Summary: Phase II of the development of a WtE facility.

  115. China - WtE Facility

    Updated 22 June 2017

    Summary: WtE facility development - Phase II

  116. China – WtE Facility

    Updated 02 June 2017

    Summary: Phase I of the construction of a WtE facility.

  117. China - WtE Facility

    Updated 01 June 2017

    Summary: Construction of a 383,250 tpa WtE facility.

  118. China - WtE Facility

    Updated 01 June 2017

    Summary: Construction of a 900 tpd WtE facility.

  119. China - Hazardous Waste Facility

    Updated 30 May 2017

    Summary: Construction of a hazardous waste treatment facility.

  120. China - Biomass Plant

    Updated 30 May 2017

    Summary: Construction of a 30 MW biomass plant.

  121. China - Landfill & Hazardous Waste Facility

    Updated 26 May 2017

    Summary: Phase II of a landfill and hazardous waste processing facility.

  122. China - Landfill & Hazardous Waste Facility

    Updated 26 May 2017

    Summary: Phase II of a landfill and hazardous waste processing facility.

  123. China - WtE Facility

    Updated 25 May 2017

    Summary: Construction of a WtE facility.

  124. China - Biomass Facility

    Updated 25 May 2017

    Summary: Construction of a 30 MW biomass power plant.

  125. China - WtE Facility

    Updated 08 May 2017

    Summary: Construction of a 1,200 tpd WtE facility.

  126. China - WtE Facility

    Updated 05 May 2017

    Summary: Construction of a 90 MW WtE plant.

  127. China - Biomass Plant

    Updated 26 April 2017

    Summary: Construction of a 30 MW biomass plant.

  128. China - Waste Treatment Facility

    Updated 10 April 2017

    Summary: Upgrading of a food waste treatment plant.

  129. China - WtE Facility

    Updated 23 March 2017

    Summary: Construction of a 1,000 tpd WtE facility.

  130. China - WtE Facility

    Updated 21 March 2017

    Summary: Construction of a 900 tpd WtE facility.

  131. China - WtE Facility

    Updated 15 March 2017

    Summary: Construction of a 9 MW WtE plant.

  132. China - Biomass Plant

    Updated 15 March 2017

    Summary: Construction of a 300,000 tpa biomass plant.

  133. China - Biomass Plant

    Updated 14 March 2017

    Summary: Construction of a 30 MW biomass plant.

  134. China - Biomass Plant

    Updated 09 January 2017

    Summary: Construction of a 30 MW biomass plant.

  135. China - Biomass Plant

    Updated 09 January 2017

    Summary: Construction of a 30 MW biomass plant.

  136. China - Biomass Pellet & Heating Facility

    Updated 09 January 2017

    Summary: Construction of a biomass-fuelled production and energy facility.

  137. China - Hazardous Waste Incineration Plant

    Updated 05 January 2017

    Summary: Construction of industrial hazardous waste incineration facility.

  138. China - Biomass Pellet & Heating Facilities

    Updated 05 January 2017

    Summary: Development of a biomass pellet plant and biomass heating facility.

  139. China - WtE Facility

    Updated 03 January 2017

    Summary: Phase I of the construction of a WtE facility.

  140. China - WtE Facility

    Updated 03 January 2017

    Summary: Construction of a 292,000 tpa WtE facility.

  141. China - Hazardous Waste Treatment Facility

    Updated 30 December 2016

    Summary: Construction of a hazardous waste treatment facility.

  142. China - Hazardous Waste Facility

    Updated 23 December 2016

    Summary: Construction of a 50,000 tpa hazardous waste treatment and processing facility.

  143. China - Waste Processing Facility

    Updated 23 December 2016

    Summary: Plant for treating dead and diseased animals.

  144. China - Biomass Facility

    Updated 09 December 2016

    Summary: Construction of a 300,000 tpa biomass plant.

  145. China - Biomass Facility

    Updated 09 December 2016

    Summary: Construction of a 300,000 tpa biomass plant.

  146. China - WtE Project

    Updated 28 October 2016

    Summary: Construction of a 36 MW WtE plant.

  147. China - WtE Facility

    Updated 27 October 2016

    Summary: Construction of a 600 tpd WtE facility in two phases.

  148. China - Biomass Facility

    Updated 26 October 2016

    Summary: Construction of a 30 MW biomass plant fired with agricultural waste.

  149. China – WtE Facility

    Updated 25 October 2016

    Summary: Development of MSW-fired cogeneration facility.

  150. China - Biomass Cogeneration Facility

    Updated 25 October 2016

    Summary: Development of a biomass pellet plant and biomass heating facility.

  151. China - Hazardous Waste Treatment Facility

    Updated 24 October 2016

    Summary: Expansion at hazardous waste facility.

  152. China - WtE Facility

    Updated 19 October 2016

    Summary: Construction of a WtE facility - Phase I

  153. China - Biomass Plant

    Updated 16 September 2016

    Summary: Construction of a 30 MW biomass plant.

  154. China - Biomass Plant

    Updated 15 September 2016

    Summary: Construction of a 15 MW biomass plant.

  155. China - WtE Facility

    Updated 14 September 2016

    Summary: Construction of a 400 tpd WtE plant.

  156. China - Biomass Plant

    Updated 06 September 2016

    Summary: Construction of a 30 MW biomass plant.

  157. China - Biomass Facility

    Updated 06 September 2016

    Summary: Construction of a 30 MW biomass energy plant.

  158. China - WtE Facility

    Updated 02 September 2016

    Summary: Construction of a 1,050 tpd WtE facility.

  159. China - Hazardous Waste Treatment Plant

    Updated 04 August 2016

    Summary: Construction of an 80,000 tpa hazardous waste facility.

  160. China - WtE Facility

    Updated 12 July 2016

    Summary: Construction of a 90 million kWh per annum WtE facility.

  161. China - WtE Facility

    Updated 14 June 2016

    Summary: Construction of WtE facility - Phase II

  162. China - WtE Facility

    Updated 30 May 2016

    Summary: Construction of a household WtE facility.

  163. China - Hazardous Waste Incineration Plant

    Updated 12 May 2016

    Summary: Construction of a hazardous waste incineration facility.

  164. China - WtE Facility

    Updated 12 May 2016

    Summary: Construction of an 800 tpd WtE facility.

  165. China - WtE Facility

    Updated 13 April 2016

    Summary: Construction of a WtE facility.

  166. China - Hazardous Waste Landfill

    Updated 12 April 2016

    Summary: Development of a hazardous waste landfill.

  167. China - Biomass Plant

    Updated 04 April 2016

    Summary: Construction of a 30 MW biomass plant.

  168. China – Waste Treatment Facility

    Updated 31 March 2016

    Summary: Construction of a food waste treatment facility.

  169. China - Waste Treatment Facility

    Updated 10 March 2016

    Summary: Construction of a hazardous waste treatment facility.

  170. China - Hazardous Solid Waste Landfill

    Updated 08 March 2016

    Summary: Development of a hazardous solid waste landfill.

  171. China - WtE Facility

    Updated 13 January 2016

    Summary: Construction of a 25 MW WtE plant and associated leachate treatment facility.

  172. China - Biomass Plant

    Updated 24 December 2015

    Summary: Construction of an 18 MW biomass plant.

  173. China - WtE Project

    Updated 10 December 2015

    Summary: Construction of a WtE plant.

  174. China - WtE Project

    Updated 02 November 2015

    Summary: Construction of a >75,000 MWh per annum WtE plant.

  175. China - Biomass Facility

    Updated 19 October 2015

    Summary: Construction of an 18 MW biomass plant.

  176. China - WtE Facility

    Updated 16 October 2015

    Summary: Construction of a WtE cogeneration facility.

  177. China - WtE Facility

    Updated 24 September 2015

    Summary: Construction of a WtE facility - Phase I

  178. China - WtE Project

    Updated 14 September 2015

    Summary: Development of a WtE facility - Phase II.

  179. China - WtE Facility

    Updated 20 August 2015

    Summary: Construction of a 219,000 tpa WtE facility.

  180. China - WtE Facility

    Updated 20 August 2015

    Summary: Phase II of WtE facility development project.

  181. China - WtE Facility

    Updated 14 April 2015

    Summary: Construction of a WtE facility.

  182. China - WtE Facility

    Updated 30 December 2014

    Summary: Construction of a WtE plant.

  183. China - WtE Plant

    Updated 30 December 2014

    Summary: Construction of a WtE plant.

  184. China - Landfill Facility

    Updated 24 December 2014

    Summary: Construction of a hazardous solid waste landfill facility.

  185. China - Hazardous Waste Project

    Updated 19 December 2014

    Summary: Construction of a hazardous waste landfill.

  186. China - Biomass Power Facility

    Updated 11 November 2014

    Summary: Approval granted for 30 MW biomass power generation project.

  187. China - Biomass Pellet Facilities

    Updated 27 October 2014

    Summary: Development of 29 agricultural waste pellet facilities.

  188. China - WtE Facility

    Updated 15 October 2014

    Summary: Upgrading of a fly ash processing system.

  189. China - Leachate System

    Updated 15 October 2014

    Summary: Installation of a leachate system.

  190. China - Leachate System

    Updated 15 October 2014

    Summary: Installation of a leachate processing system.

  191. China - WtE Facility

    Updated 14 October 2014

    Summary: Development of a 600 tpd WtE facility.

  192. China - Hazardous Waste Incineration Plant

    Updated 01 August 2014

    Summary: Construction of a hazardous solid waste incineration plant.

  193. China - WtE Project

    Updated 22 July 2014

    Summary: Completion of a 12 MW WtE plant.

  194. China - WtE Project

    Updated 09 May 2014

    Summary: Phase I of the construction of a 40 MW WtE plant.

  195. China - Solid Waste Treatment Facility

    Updated 30 December 2013

    Summary: Agreement signed for industrial solid waste treatment facility.

  196. China - Hazardous Waste Treatment Facility

    Updated 04 November 2013

    Summary: Construction of a >US$60 million hazardous waste facility.

  197. China - Environmental Protection Projects

    Updated 01 November 2013

    Summary: Waste and environmental protection agreement signed.

  198. China - WtE Plant

    Updated 23 August 2013

    Summary: WtE plant construction - Phase III completed.

  199. China - Waste & Environmental Protection Park

    Updated 07 June 2013

    Summary: Construction of an environmental protection park.

  200. China - WtE Plants

    Updated 06 December 2012

    Summary: WtE facilities programme.

Keyword search

Filter Search Results

Facility Type

Waste Type

Development Phase

Country(s)

Region(s)

Capacity Range(s)

Output (MW) Range(s)

Value (US$) Range(s)

Date Range

to