Dealing with MSW in China
Date Published: 6th April 2022
Dealing with rising levels of waste has become a key challenge for China’s regional and municipal governments. Traditionally, Chinese cities have relied on landfill, of varying degrees of sophistication. However, the rapid growth in size and wealth of Chinese cities in the past two decades has left these facilities unable to cope with rising levels of urban waste. The problem has been most acute in the major industrial areas on or near the eastern coast, such as Beijing, Shanghai, Guangzhou or Shenzhen, the latter being created virtually from scratch in the 1990s. However, growth is also now rapid in many cities further west.
Municipal authorities have therefore tended to need a ‘quick fix’ for the problem of rising waste levels. Expanding landfill is often not popular and sometimes not possible in cities such as Chongqing where space is at a premium. Incineration of waste has therefore tended to be the preferred option. In the past two decades, some of the largest WtE facilities in the world have been planned and built in China, with many more on the way. WtE also has the advantage of contributing to cities’ ever-rising power consumption requirements.
The process has not always been smooth; popular opposition to waste plants has on occasion proved politically powerful. Beijing, for example, has struggled to build all its planned facilities, and dumping around the edges of the city remains common. COVID-19 has of course delayed and disrupted many plans, not least those involving overseas input.
Yet, the actual and potential size of the Chinese WtE sector remains vast. Since 2013, AcuComm has tracked nearly 300 WtE plant investments across China, worth an estimated US$23.6 billion. Many are large and comprise multiple waste lines. The largest is perhaps the Shanghai Laogang facility, which has capacity for 6,000 tonnes of municipal waste per day following a major expansion in 2019. The work was undertaken by a mixture of firms from China, Japan and Germany.
Market View |
Show Instant MarketView |
Value of Projects
by completion date
Number of projects
by completion date
Project waste/feedstock
throughput capacity
Projects output power
shown in MW
Click on the project titles below to see further information about each of the projects.
Please make sure that you are logged in and have an active subscription to WasteView Contract Finder to see the full details of the projects listed below.
Number of projects attached to this highlight: 297 |
Refine This Search |
Updated: 24 March 2022
Summary: Construction of a WtE facility.
Updated: 24 March 2022
Summary: Construction of a WtE facility.
China - Waste Treatment & WtE Facility
Updated: 21 January 2022
Summary: Development of a solid waste treatment and WtE facility.
Updated: 05 January 2022
Summary: Construction of a 40 MW WtE facility.
Updated: 04 January 2022
Summary: Development of a 3,000 tpd WtE facility.
China - WtE & Waste Treatment Facility
Updated: 04 January 2022
Summary: Construction of an 18 MW WtE facility and food waste treatment facility.
Updated: 10 December 2021
Summary: Development of a 655 tpd integrated waste treatment facility.
Updated: 07 December 2021
Summary: Development of a 500 tpd WtE facility.
Updated: 07 December 2021
Summary: Development of a 750 tpd WtE facility.
Updated: 06 December 2021
Summary: Development of a 600 tpd WtE facility.
Updated: 06 December 2021
Summary: Development of a 600 tpd WtE facility.
Updated: 03 December 2021
Summary: Development of an 800 tpd WtE facility.
Updated: 03 December 2021
Summary: Development of a 1,200 tpd WtE facility.
Updated: 02 December 2021
Summary: Development of a 700 tpd WtE facility.
Updated: 02 December 2021
Summary: Second phase of a WtE plant development.
Updated: 01 December 2021
Summary: Development of a 1,000 tpd WtE facility.
Updated: 01 December 2021
Summary: Development of a 1,000 tpd WtE facility.
Updated: 30 November 2021
Summary: Construction of a 700 tpd WtE facility.
Updated: 30 November 2021
Summary: Development of a 1,350 tpd WtE facility.
Updated: 26 November 2021
Summary: Development of a 1,200 tpd WtE facility.
Updated: 25 November 2021
Summary: Development of a 600 tpd WtE facility.
Updated: 25 November 2021
Summary: Development of a 1,200 tpd WtE plant.
Updated: 25 November 2021
Summary: Development of a 1,500 tpd WtE facility.
Updated: 24 November 2021
Summary: Development of a 600 tpd WtE plant.
Updated: 13 September 2021
Summary: Phase II of the development of a WtE facility.
Updated: 11 June 2021
Summary: Construction of a 35 MW WtE facility.
Updated: 09 June 2021
Summary: Construction of a 25 MW WtE facility.
Updated: 03 May 2021
Summary: Installation of 2 x 300 tpd furnaces.
Updated: 07 January 2021
Summary: Construction of a 25 MW WtE facility.
Updated: 14 December 2020
Summary: Development of a 1,400 tpd WtE facility.
Updated: 14 December 2020
Summary: Development of a 1,000 tpd WtE facility.
Updated: 14 December 2020
Summary: Development of a WtE facility.
Updated: 02 December 2020
Summary: Construction of a WtE facility.
Updated: 23 November 2020
Summary: Installation of a 500 tpd furnace at a WtE facility.
Updated: 23 November 2020
Summary: Development of a 1,200 tpd WtE facility.
Updated: 13 November 2020
Summary: Construction of a 1,050 tpd WtE facility.
Updated: 11 August 2020
Summary: Installation of a 700 tpd grate system.
Updated: 10 August 2020
Summary: Installation of a 500 tpd grate system.
Updated: 07 August 2020
Summary: Installation of a 500 tpd grate system.
Updated: 05 August 2020
Summary: Installation of a 500 tpd grate system.
Updated: 17 July 2020
Summary: Installation of two 750 tpd grate systems.
Updated: 06 July 2020
Summary: Construction of a WtE facility.
Updated: 18 June 2020
Summary: Construction of a 12 MW WtE facility.
Updated: 18 June 2020
Summary: Construction of a 12 MW WtE facility.
Updated: 11 June 2020
Summary: Construction of a 35 MW WtE facility.
Updated: 11 June 2020
Summary: Construction of a 36 MW WtE facility.
Updated: 22 May 2020
Summary: Construction of a 500 tpd WtE facility.
Updated: 21 April 2020
Summary: Installation of two 850 tpd grate systems.
Updated: 21 April 2020
Summary: Installation of two 500 tpd grate systems.
Updated: 07 April 2020
Summary: Phase II of WtE facility development project.
Updated: 27 March 2020
Summary: Installation of a 600 tpd grate system.
Updated: 20 March 2020
Summary: Installation of two 750 tpd grate systems.
Updated: 20 March 2020
Summary: Installation of a 600 tpd grate system.
Updated: 19 March 2020
Summary: Installation of a second 600 tpd grate system.
Updated: 18 March 2020
Summary: Construction of a WtE facility in two phases.
Updated: 18 March 2020
Summary: Expansion of a WtE facility with two 450 tpd grate systems.
Updated: 03 February 2020
Summary: Construction of a 12 MW WtE plant.
Updated: 31 January 2020
Summary: Construction of a 21 MW WtE facility.
Updated: 31 January 2020
Summary: Construction of an 18 MW WtE plant & food waste processing plant.
Updated: 30 January 2020
Summary: Construction of a 3,000 tpd WtE facility and leachate treatment station.
Updated: 30 January 2020
Summary: Construction of a 292,000 tpa WtE facility.
Updated: 27 January 2020
Summary: Construction of a WtE facility.
Updated: 23 January 2020
Summary: Construction of a WtE facility.
Updated: 10 January 2020
Summary: Installation of two 800 tpd grate systems at a WtE facility.
Updated: 10 January 2020
Summary: Installation of two 600 tpd grate systems at a WtE facility.
Updated: 08 January 2020
Summary: Installation of a 600 tpd grate system at a WtE facility.
Updated: 07 January 2020
Summary: Installation of a 300 tpd grate system at a WtE facility.
Updated: 06 January 2020
Summary: Construction of a 600 tpd WtE facility.
Updated: 06 January 2020
Summary: Installation of a 750 tpd grate system at a WtE facility.
China - WtE & Waste Treatment Facilities
Updated: 18 December 2019
Summary: Development of waste-to-energy and food waste treatment facilities.
Updated: 13 December 2019
Summary: WtE facility construction - Phase III.
Updated: 12 December 2019
Summary: Construction of a 1,200 tpd WtE facility.
China - WtE & Waste Treatment Facilities
Updated: 12 December 2019
Summary: Development of waste-to-energy and food waste treatment facilities.
Updated: 11 December 2019
Summary: Construction of a WtE plant.
Updated: 11 December 2019
Summary: Construction of a WtE plant.
Updated: 15 November 2019
Summary: Construction of a 225 tpd WtE facility.
Updated: 15 November 2019
Summary: Construction of a 600 tpd WtE facility.
Updated: 14 November 2019
Summary: Construction of a 500 tpd WtE facility.
Updated: 14 November 2019
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 23 October 2019
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 22 October 2019
Summary: Construction of a 12 MW WtE facility.
Updated: 22 October 2019
Summary: Construction of a 900 tpd WtE facility.
Updated: 21 October 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 21 October 2019
Summary: Development of a 1,400 tpd WtE facility.
Updated: 08 October 2019
Summary: Construction of a WtE facility.
Updated: 26 September 2019
Summary: Upgrading of a WtE facility.
Updated: 18 September 2019
Summary: Phase I of the construction of a 2,250 tpd WtE facility.
Updated: 30 August 2019
Summary: Development of an 800 tpd WtE facility.
Updated: 30 August 2019
Summary: Development of a 1,050 tpd WtE facility.
Updated: 28 August 2019
Summary: Development of a 50 MW WtE facility.
Updated: 16 August 2019
Summary: Phase II of the development of a 1,000 tpd WtE facility.
Updated: 08 August 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 08 August 2019
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 06 August 2019
Summary: Construction of an 80 MW WtE facility.
Updated: 11 July 2019
Summary: Construction of a 730,000 tpa WtE facility.
Updated: 11 July 2019
Summary: Construction of a 130 MW WtE facility.
Updated: 06 July 2019
Summary: Development of Phase II of the world's largest thermal waste treatment plant.
Updated: 03 July 2019
Summary: Construction of a 1,200 tpd WtE plant.
Updated: 28 June 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 18 June 2019
Summary: Construction of a 400 tpd WtE facility.
Updated: 17 June 2019
Summary: Construction of a 600 tpd WtE facility.
Updated: 17 June 2019
Summary: Construction of a 500 tpd WtE facility.
Updated: 11 June 2019
Summary: WtE facility development - Phase II.
Updated: 07 June 2019
Summary: Construction of a 450 tpd WtE plant.
Updated: 06 June 2019
Summary: Construction of a 3,000 tpd WtE plant.
Updated: 05 June 2019
Summary: Construction of a 1,400 tpd WtE plant.
Updated: 17 May 2019
Summary: Construction of a 50 MW WtE facility.
Updated: 17 May 2019
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 09 May 2019
Summary: 3,000 tpd expansion of a WtE facility.
Updated: 17 April 2019
Summary: Construction of a 365,000 tpa WtE facility.
Updated: 21 March 2019
Summary: Redevelopment and expansion of WtE facility.
Updated: 21 March 2019
Summary: Phase II of the development of a 900 tpd WtE facility.
Updated: 18 March 2019
Summary: Installation of two 750 tpd grate systems at a WtE facility.
Updated: 18 March 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 12 March 2019
Summary: Installation of two 500 tpd grate systems at a WtE facility.
Updated: 07 March 2019
Summary: Installation of a 600 tpd grate system.
Updated: 06 March 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 06 March 2019
Summary: Installation of a 600 tpd grate system.
Updated: 05 March 2019
Summary: Expansion of a WtE facility.
Updated: 04 March 2019
Summary: Expansion of a WtE facility.
Updated: 04 March 2019
Summary: Expansion of a WtE facility.
Updated: 28 February 2019
Summary: Phase II of the development of a WtE facility.
Updated: 26 February 2019
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 20 February 2019
Summary: Installation of two 400 tpd grate systems at a WtE facility.
Updated: 19 February 2019
Summary: Installation of two 400 tpd grate systems at a WtE facility.
Updated: 19 February 2019
Summary: Installation of a 600 tpd furnace at a WtE facility.
Updated: 14 February 2019
Summary: Construction of a WtE facility.
Updated: 13 February 2019
Summary: Construction of a 27 MW WtE facility.
Updated: 06 February 2019
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 24 January 2019
Summary: Installation of a 600 tpd furnace at a WtE facility.
Updated: 23 January 2019
Summary: Installation of a 600 tpd furnace at a WtE facility.
Updated: 23 January 2019
Summary: Installation of a 300 tpd furnace at a WtE facility.
Updated: 22 January 2019
Summary: Installation of a 300 tpd furnace at a WtE facility.
Updated: 22 January 2019
Summary: Phase II development of a WtE facility.
Updated: 21 January 2019
Summary: Phase II development of a WtE facility.
Updated: 18 January 2019
Summary: Installation of a further two 350 tpd grate systems.
Updated: 18 January 2019
Summary: Expansion of a WtE facility.
Updated: 16 January 2019
Summary: Construction of an RDF-fuelled WtE plant.
Updated: 15 January 2019
Summary: Construction of a 600 tpd WtE facility.
Updated: 08 January 2019
Summary: Development of the world's largest waste incineration facility.
Updated: 04 January 2019
Summary: Development of a 1,000 tpd WtE facility.
Updated: 03 January 2019
Summary: Construction of a WtE facility.
Updated: 02 January 2019
Summary: Construction of a 1,050 tpd WtE facility.
Updated: 21 December 2018
Summary: Construction of a 400 tpd WtE plant.
Updated: 20 December 2018
Summary: Construction of a WtE facility - Phase III.
Updated: 22 November 2018
Summary: Development of a 800 tpd WtE facility.
Updated: 21 November 2018
Summary: Construction of a 350 tpd WtE facility.
Updated: 06 November 2018
Summary: Construction of a WtE facility with asssociated landfill and leachate treatment plant.
Updated: 24 October 2018
Summary: Construction of a 25 MW WtE facility.
Updated: 22 October 2018
Summary: Construction of a 12 MW WtE facility.
Updated: 22 October 2018
Summary: Construction of a 12 MW WtE facility.
Updated: 19 October 2018
Summary: Development of a 45 MW WtE facility.
Updated: 19 October 2018
Summary: Construction of a 50 MW WtE facility.
Updated: 18 October 2018
Summary: Construction of a 750 tpd WtE plant.
Updated: 17 October 2018
Summary: Construction of a 5,220 tpd WtE facility.
Updated: 16 October 2018
Summary: Construction of a 328,500 tpa WtE facility.
Updated: 09 October 2018
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 18 September 2018
Summary: Installation of a 750 tpd grate system.
Updated: 18 September 2018
Summary: Installation of three 750 tpd grate systems.
Updated: 17 September 2018
Summary: Installation of a 750 tpd grate system.
Updated: 14 September 2018
Summary: Installation of two 750 tpd grate systems.
Updated: 14 September 2018
Summary: Installation of two 400 tpd grate systems.
Updated: 13 September 2018
Summary: Construction of a 1,500 tpd WtE plant.
Updated: 13 September 2018
Summary: Construction of a 750 tpd WtE plant.
Updated: 12 September 2018
Summary: Construction of a 50 MW WtE plant.
Updated: 06 September 2018
Summary: Expansion of a WtE facility.
Updated: 15 August 2018
Summary: Construction of a 1,050 tpd WtE plant.
Updated: 13 August 2018
Summary: Dismantling, redevelopment and upgrading of WtE facility.
Updated: 07 August 2018
Summary: Construction of a 400 tpd WtE facility.
Updated: 06 August 2018
Summary: Construction of a 50 MW WtE plant.
Updated: 03 August 2018
Summary: Phase II of the construction of a household WtE facility.
China - Waste Management Facility
Updated: 02 August 2018
Summary: Development of a 700 tpd waste management facility.
Updated: 02 August 2018
Summary: Development of a 900 tpd WtE facility.
Updated: 25 July 2018
Summary: Development of a 15 MW WtE facility.
China - WtE & Biomass Facility
Updated: 19 July 2018
Summary: Development of a WtE and biomass facility.
Updated: 09 July 2018
Summary: Construction of an 800 tpd WtE facility.
Updated: 09 July 2018
Summary: Construction of a 400 tpd WtE facility.
Updated: 22 June 2018
Summary: Installation of two 600 tpd grate systems.
Updated: 21 June 2018
Summary: Installation of two 600 tpd grate systems.
Updated: 21 June 2018
Summary: Installation of a 600 tpd grate system.
Updated: 15 June 2018
Summary: Phase II of the development of a WtE facility.
Updated: 15 June 2018
Summary: Installation of a 400 tpd grate system.
China - WtE & Biomass Facility
Updated: 12 June 2018
Summary: Construction of a waste-to-energy and biomass facility.
Updated: 07 June 2018
Summary: Supply of six grate systems to a waste-to-energy plant.
Updated: 05 June 2018
Summary: Supply of two grate systems to a waste-to-energy plant.
Updated: 16 May 2018
Summary: Development of a 1,050 tpd WtE plant.
Updated: 03 May 2018
Summary: Expansion of a WtE facility.
Updated: 01 May 2018
Summary: Construction of a 1,400 tpd WtE facility.
Updated: 27 April 2018
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 26 April 2018
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 13 April 2018
Summary: Construction of a 25 MW WtE facility.
Updated: 29 March 2018
Summary: Construction of a 35 MWe SRF-fuelled power plant.
Updated: 27 March 2018
Summary: Phase II of the development of a 5,400 tpd WtE facility.
Updated: 27 March 2018
Summary: Construction of a 400 tpd WtE plant.
Updated: 22 February 2018
Summary: Construction of a 2,400 tpd waste-to-energy facility.
Updated: 19 February 2018
Summary: Construction of a 30 MW WtE plant.
Updated: 08 February 2018
Summary: Phase III of a WtE facility development.
Updated: 01 February 2018
Summary: Installation of a 300 tpd grate at a WtE facility.
Updated: 01 February 2018
Summary: Installation of a 500 tpd grate system.
Updated: 02 January 2018
Summary: Expansion of a WtE facility.
Updated: 27 December 2017
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 22 December 2017
Summary: Construction of a 400 tpd WtE facility.
Updated: 14 December 2017
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 12 December 2017
Summary: Construction of a 20 MW WtE facility.
Updated: 12 December 2017
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 11 December 2017
Summary: Construction of a 292,000 tpa WtE facility.
Updated: 08 December 2017
Summary: Phase I of an 800 tpd WtE facility.
Updated: 04 December 2017
Summary: Construction of a 3,000 tpd WtE facility.
Updated: 23 November 2017
Summary: Construction of a 600 tpd WtE facility.
Updated: 22 November 2017
Summary: Construction of a 25 MW WtE plant.
Updated: 07 November 2017
Summary: Upgrading of a 750 tpd WtE facility.
Updated: 06 November 2017
Summary: Construction of a 400 tpd WtE facility.
Updated: 23 October 2017
Summary: Phase II development of a WtE facility.
Updated: 23 October 2017
Summary: Construction of a 1.1 million tpa WtE facility.
Updated: 18 October 2017
Summary: Phase II of a WtE facility.
Updated: 06 September 2017
Summary: Installation of a 400 tpd grate system.
Updated: 06 September 2017
Summary: Installation of a 550 tpd grate system.
Updated: 05 September 2017
Summary: Installation of two 300 tpd grate systems.
Updated: 30 August 2017
Summary: Construction of a 547,500 tpa WtE facility.
Updated: 24 August 2017
Summary: Installation of two 400 tpd grate systems.
Updated: 23 August 2017
Summary: Installation of two 600 tpd grate systems.
Updated: 23 August 2017
Summary: Installation of two 300 tpd grate systems.
Updated: 11 August 2017
Summary: Construction of an 800 tpd WtE facility.
Updated: 02 August 2017
Summary: Development of a 1,830 tpd WtE facility.
Updated: 01 August 2017
Summary: Construction of a 292,000 tpa WtE facility.
Updated: 27 July 2017
Summary: Phase I of the development of a WtE facility.
Updated: 21 July 2017
Summary: Construction of a 1,220 tpd WtE plant.
Updated: 21 July 2017
Summary: Construction of a 1,000 tpd WtE plant.
Updated: 20 July 2017
Summary: Construction of a 36 MW WtE plant.
Updated: 17 July 2017
Summary: Construction of a WtE facility.
Updated: 11 July 2017
Summary: Construction of a 500 tpd WtE plant.
Updated: 10 July 2017
Summary: Phase II of the development of a WtE facility.
Updated: 26 June 2017
Summary: Construction of a 1,200 tpd WtE facility.
Updated: 22 June 2017
Summary: WtE facility development - Phase II
Updated: 02 June 2017
Summary: Phase I of the construction of a WtE facility.
Updated: 01 June 2017
Summary: Construction of a 900 tpd WtE facility.
Updated: 25 May 2017
Summary: Construction of a WtE facility.
Updated: 23 May 2017
Summary: Installation of two grate systems.
Updated: 12 May 2017
Summary: Supply of a grate system.
Updated: 12 May 2017
Summary: Supply of a grate system.
Updated: 09 May 2017
Summary: Installation of a 525 tpd grate system.
Updated: 05 May 2017
Summary: Construction of a 90 MW WtE plant.
China - Waste Disposal & WtE Facility
Updated: 07 April 2017
Summary: Second phase of a waste disposal and WtE facility.
Updated: 06 April 2017
Summary: Construction of a WtE facility as part of an industrial park development.
Updated: 23 March 2017
Summary: Construction of a 1,000 tpd WtE facility.
Updated: 21 March 2017
Summary: Construction of a 900 tpd WtE facility.
Updated: 20 March 2017
Summary: Construction of nine WtE plants.
Updated: 15 March 2017
Summary: Construction of a 9 MW WtE plant.
Updated: 14 February 2017
Summary: Development of a WtE facility.
Updated: 01 December 2016
Summary: 500 tpd WtE plant construction.
Updated: 30 November 2016
Summary: Construction of the world's largest WtE facility.
Updated: 29 November 2016
Summary: Construction of a 1,000 tpd WtE plant.
Updated: 29 November 2016
Summary: Construction of a 600 tpd WtE plant.
Updated: 28 November 2016
Summary: Expansion of a WtE facility.
Updated: 11 November 2016
Summary: Installation of two grate systems for a WtE facility.
Updated: 07 November 2016
Summary: Installation of a grate system for a WtE facility.
Updated: 03 November 2016
Summary: Three grate systems to be supplied to WtE facility.
Updated: 28 October 2016
Summary: Construction of a 36 MW WtE plant.
Updated: 27 October 2016
Summary: Construction of a 600 tpd WtE facility in two phases.
Updated: 25 October 2016
Summary: Development of MSW-fired cogeneration facility.
Updated: 14 September 2016
Summary: Construction of a 400 tpd WtE plant.
Updated: 02 September 2016
Summary: Construction of a 1,050 tpd WtE facility.
Updated: 15 July 2016
Summary: Installation of two 500 tpd incineration lines.
Updated: 14 July 2016
Summary: Construction of a 100 MW WtE facility.
Updated: 13 July 2016
Summary: Installation of two 500 tpd combustion grate systems.
Updated: 14 June 2016
Summary: Construction of WtE facility - Phase II
Updated: 30 May 2016
Summary: Construction of a household WtE facility.
Updated: 12 May 2016
Summary: Construction of an 800 tpd WtE facility.
Updated: 29 April 2016
Summary: Construction of a 400,000 tpa WtE plant.
Updated: 13 April 2016
Summary: Construction of a WtE facility.
Updated: 13 January 2016
Summary: Construction of a 25 MW WtE plant and associated leachate treatment facility.
Updated: 02 November 2015
Summary: Construction of a >75,000 MWh per annum WtE plant.
Updated: 16 October 2015
Summary: Construction of a WtE cogeneration facility.
Updated: 24 September 2015
Summary: Construction of a WtE facility - Phase I
Updated: 14 September 2015
Summary: Development of a WtE facility - Phase II.
Updated: 20 August 2015
Summary: Construction of a 219,000 tpa WtE facility.
Updated: 24 July 2015
Summary: WtE facility development.
Updated: 15 July 2015
Summary: Construction of a 600 tpd WtE facility.
Updated: 07 May 2015
Summary: Construction of a 40 MW WtE facility.
Updated: 22 April 2015
Summary: Development of a 1,500 tpd WtE facility.
Updated: 22 April 2015
Summary: Development of a 500 tpd WtE facility.
Updated: 14 April 2015
Summary: Construction of a WtE facility.
Updated: 03 April 2015
Summary: Construction of a 1,500 tpd WtE facility.
Updated: 28 January 2015
Summary: Expansion of WtE plant.
Updated: 21 January 2015
Summary: Development of a WtE facility.
Updated: 30 December 2014
Summary: Construction of a WtE plant.
Updated: 15 October 2014
Summary: Upgrading of a fly ash processing system.
Updated: 24 September 2014
Summary: Completion of a 15 MW WtE facility.
Updated: 22 July 2014
Summary: Completion of a 12 MW WtE plant.
Updated: 09 May 2014
Summary: Phase I of the construction of a 40 MW WtE plant.
Updated: 30 August 2013
Summary: Construction starts on new WtE facility.
Updated: 30 August 2013
Summary: Completion of a WtE facility.
Updated: 23 August 2013
Summary: WtE plant construction - Phase III completed.
Updated: 15 April 2013
Summary: Construction of a 25 MW WtE facility.
Updated: 19 March 2013
Summary: Proposed development of a WtE facility.
Updated: 06 March 2013
Summary: Construction of a >10 MW WtE plant.
Updated: 28 December 2012
Summary: Preferred bidder named for >40 MW WtE project.