AcuComm Waste Business Finder
  • Search
  • Bosnia and Herzegovina - Landfill & Recycling Yard

    05/07/2018 | Project Number: 006204

    Key Project Facts

    Country: Location:
    Bosnia and Herzegovina Živinice
       
    Principal Facility Type: Facility Type:
    Integrated/mixed facilities Composting, Energy from Biomass, Landfill, Recycling, Waste Processing, Waste Transfer
       
    Principal Waste Type: Waste Type:
    MSW Biomass / Organic not specified, Construction/Demolition, Landfill Gas, Municipal Solid Waste
       
    Development Phase: Value:
    Feasibility US$ 9,318,177
       

    Construction of a solid waste landfill and a recycling yard.

    The European Bank for Reconstruction and Development (EBRD) is considering providing finance to the Živinice Regional Solid Waste Project (No: 49631).

    The proposed project involves the construction and operation of an EU-compliant, regional solid waste landfill (RSL) and a recycling yard that will serve three municipalities in Tuzla Canton: Zivinice, Banovci and Kladanj, with a total population of 95,000.

    On 4th July 2018, the EBRD disclosed the Environmental and Social Impact Assessments (ESIA) document related to the project, and the project summary document (PSD) on 5th July. The objective is to prevent further pollution of local water and soil, and reduce emissions of greenhouse gases.

    The project would be financed by an EBRD loan of up to €6 million and co-financed with an investment grant of up to €2 million. The EBRD sovereign loan will be provided (via a legislated cascade of sub-loans) to the newly established regional solid waste company, Eko-Sep doo Zivinice.

    The chosen location is “Separacija 1” in Živinice. The three Municipalities signed an agreement in 2012 on the establishment of an inter-municipal council for implementation of the project. A location study and feasibility study were prepared by Fichtner in 2012 and Eko-Sep purchased the land and has obtained all the necessary permits for the construction of the RSL.

    The site will accommodate:

    • a landfill body for disposal of municipal non-hazardous waste (5.85 hectares, maximum 52 metres height and with a capacity of 1,269,340 cubic metres), and
    • a regional waste management centre consisting of a recycling yard, facility for mechanical and biological treatment of municipal waste and composting unit for treatment of biodegradable waste.

    The RSL will be constructed in four phases.

    Phase 1

    Stage 1: construction of an entry-exit zone (front gate, asphalted road, weighbridge with a canopy, and oil and grease separator and sedimentation tank), part of the fence around part of the landfill, administrative building and associated parking lot, service centre with associated plateau, internal roads, first part of the landfill disposal area with a system for collection and recirculation of leachate and passive degassing system and peripheral roads around the parts of cells, perimeter canal around the landfill to receive storm water, tank/precipitator to collect storm water, platform for washing of vehicles, water supply network, sewage and electrical power supply network, and purchase of landfill machines.

    Stage 2: construction of the recycling yard with canopy.

    Stage 3: construction of the surface area for treatment of construction waste.

    Stage 4: construction/installation of a flare for burning of landfill gas (in 2021, or five years after the commissioning of the RSL).

    Stage 5: construction of the remaining part of the landfill cell for waste disposal.

    Stage 6: partial closure of the landfill with final capping layer.

    Phase 2

    Stage 1: construction of a facility for mechanical biological treatment of waste in the reserved part of the site.

    Stage 2: construction of a composting plant for processing of organic waste in the reserved part of the site.

    Stage 3: construction of cells for disposal of waste with a system to collect leachate in the reserved part of the site and a canal for collecting storm water.

    Stage 4: construction of a waste sorting facility in the reserved part of the site.

    Stage 5: construction of a transfer station in the Municipality of Kladanj at the location of the current municipal landfill "Stanovi" with all the necessary equipment (truck trailers) and equipment necessary for the operation of the station. The location needs to accommodate a loading bay area of about 5,000 square metres.

    Stage 6: construction of a waste management transfer substation in Kladanj.

    Phase 3

    Construction of the facility for processing of leachate and sanitary wastewater in the reserved part of the landfill site.

    Phase 4

    Construction of the system for generation of electricity from landfill gas in the reserved part of the landfill site.

    Contact Information

    Funding/Financial Services/Agency
    Contact Mr Josip Polic Phone 387 33 257902
    Job Title Senior Banker Fax
    Email [email protected]
     
    Company European Bank for Reconstruction and Development (EBRD)
    Address 15th Floor, Tower B Unitic Towers
    Fra Andela Zvizdovica 1
    Sarajevo
    71000
    Bosnia and Herzegovina
    Phone 387 33 257900
    Fax 387 33 667950
    Email
    Web www.ebrd.com/ebrd-in-bosnia-and-herzegovina.html
    Government Body
    Contact Mr Selmir Sljivic Phone
    Job Title Acting Director Eko-Sep doo Zivinice Fax
    Email [email protected]
     
    Company Zivinice Regional Solid Waste Project
    Address Oslobodjenja bb, Blok 5
    Zivinice
    75270
    Bosnia and Herzegovina
    Phone
    Fax
    Email
    Web
    Government Body
    Contact Mr Samir Salihovic Phone 387 35 775402
    Job Title Environmental and Social Enquiries Fax
    Email [email protected]
     
    Company Zivinice Regional Solid Waste Project
    Address Oslobodjenja bb, Blok 5
    Zivinice
    75270
    Bosnia and Herzegovina
    Phone
    Fax
    Email
    Web
    Government Body
    Company Municipalilty of Zivinice
    Address Ulica Alije Izetbegovic 28
    Zivinice
    75270
    Bosnia and Herzegovina
    Phone 387 35 743303
    Fax
    Email
    Web opcinazivinice.ba
    Waste Projects across the world

    AcuComm Database Status at 19 Jul 2018

    Total number of contacts listed: 18,339

    Total number of projects listed: 6180

    Number of countries covered: 172

    Projects created this quarter: 199

    Projects updated this quarter: 533

    For sales enquires, please contact Rob Thompson on +44 (0)1243 813696 or
    Stuart Gamble on +44 (0)1243 813692

    [email protected]      [email protected]

    Learn more to see how AcuComm can benefit you