China - WtE Facility

04/12/2017 | Project Number: 002582

Key Project Facts

Country: Location:
China Hangzhou, Zhejiang Province
   
Principal Facility Type: Facility Type:
Incineration (with energy recovery) Waste-to-Energy
   
Principal Waste Type: Waste Type:
MSW Municipal Solid Waste
   
Development Phase: Value:
Project Operational US$ 272,277,602
   
Output (MW):
150.0
   
Capacity (tonnes/year):
1,095,000
   
Commission Date:
Q4 2017
   

Project Updates

Date Change made
04/12/2017 Plant completed and operational.
06/07/2016 Project receives government subsidy; completion expected in 2017.
31/03/2016 Construction under way.

Construction of a 3,000 tpd WtE facility.

On 30th November 2017, China Everbright International announced the completion of the Hangzhou Waste-to-Energy Project in the Yuhang District of Hangzhou City after an 18-month construction period, following the successful passing of a 72+24-hour trial run. Operations have now commenced.

China Everbright signed a concession agreement with the Urban Administration Committee of Hangzhou City to invest in and build the household waste-to-energy (WtE) plant in Jiufeng Village, Yuhang District, in October 2014. This agreement followed an earlier letter of intent signed in August with Zhejiang Hanzhou Urban Construction & Investment Group (Hangzhou Urban Investment) and Zhejiang Hangzhou Yuhang City Construction Group (Yuhang City Construction).

The facility was built through a joint investment by China Everbright, Hangzhou Environmental Group and Hangzhou Yuhang City Construction Group. China Everbright holds an equity interest of 70%, Hangzhou Environmental and Yuhang City Construction hold equity interests of 20% and 10%, respectively.

Built at a cost of RMB 1.8 billion, the facility is designed with a total daily household waste processing capacity of 3,000 tonnes. It is equipped with four 750 tonnes per day mechanical grate furnaces, two 35 MW straight condensing turbine power generators and two 40 MW power generators. It is expected to generate over 390,000,000 kWh of electricity annually.

The facility's flue gas purification technology incorporates selective non-catalytic reduction (SNCR), a reaction tower for semi-dry and dry de-acidification, activated carbon injection, bag dust filtration, selective catalytic reduction (SCR), wet de-acidification and gas-to-gas heat exchange equipment.

The contract is being undertaken on a build-operate-transfer (BOT) basis, with the operational concession period lasting 30 years. Gas emissions will comply with the Euro 2000 Standard.

The Yuhang plant is the third WtE project that China Everbright secured in Zhejiang Province, after the Ningbo Beilun and Ninghai projects, and will be mainly responsible for processing part of the waste produced in downtown Hangzhou. The project is one of the largest WtE projects in China to be completed in one phase.

On 24th June 2016, China Everbright announced that it had obtained a subsidy totalling RMB 20 million towards the project under the 2016 Central Budgetary Investment Plan, which is jointly organised by the National Development and Reform Commission, the Ministry of Finance and other national ministries.

Contact Information

Contractor/Engineer
Contact Mr Wang Tianyi Phone
Job Title Chief Executive Officer Fax
Email [email protected]
 
Company China Everbright International
Address Rm. 2703, 27/F, Far East Finance Centre
16 Harcourt Road
Hong Kong
Hong Kong
Phone 852 2804 1886
Fax 852 2528 4228
Email [email protected]
Web www.ebchinaintl.com
Contractor/Engineer
Contact Mr Wang Tianyi Phone
Job Title Chief Executive Officer Fax
Email
 
Company China Everbright International
Address Rm. 2703, 27/F, Far East Finance Centre
16 Harcourt Road
Hong Kong
Hong Kong
Phone 852 2804 1886
Fax 852 2528 4228
Email [email protected]
Web www.ebchinaintl.com
Waste Projects across the world

AcuComm Database Status at 16 Dec 2017

Total number of contacts listed: 16,920

Total number of projects listed: 5657

Number of countries covered: 166

Projects created this quarter: 208

Projects updated this quarter: 509

For sales enquires, please contact Rob Thompson on +44 (0)1243 813696

[email protected]

Would you like to book a demo?