UK - Gasification Facility

11/01/2018 | Project Number: 002567

Key Project Facts

Country: Location:
United Kingdom Westbury, Wiltshire
   
Principal Facility Type: Facility Type:
Gasification Waste-to-Energy
   
Principal Waste Type: Waste Type:
MSW Municipal Solid Waste
   
Development Phase: Value:
Planning Approval Not known
   
Output (MW):
25.5
   
Capacity (tonnes/year):
160,000
   

Project Updates

Date Change made
11/01/2018 Construction expected to start in autumn 2018.
04/01/2018 Hills Group to seek planning amendments.
12/10/2017 Wiltshire Council launches public consultation.
12/10/2015 Planning permission received.
10/09/2015 Planning committee due to rule on 23rd September 2015.
30/10/2014 Chinook Sciences selected as gasification technology partner.

Construction of a >20 MW gasification plant.

On 23rd September 2015, Northacre Renewable Energy, part of the Hills Group, received planning permission from Wiltshire County Council to build a gasification plant on 6.6 acres of open land between Hills Waste Solutions’ existing Northacre Resource Recovery Centre (RRC; see Project 240) and Arla Foods Westbury Dairies at Stephenson Road, Northacre Industrial Park, Westbury.

The planning application was submitted in December 2014 and under the terms of the approval, construction must start by September 2020. Construction is expected to take three years to complete.

The Northacre Renewable Energy plant will produce renewable energy in the form of electricity and potentially heat, making it a sustainable solution for dealing with local waste whilst powering local businesses. Discussions with local businesses interested in being supplied with local heat and power from Northacre Renewable Energy are ongoing.

Up to 25.5 MW of power will be generated using 160,000 tonnes of solid recovered fuel (SRF) per annum, made at the neighbouring Northacre RRC, blended with waste from commercial and industrial outlets local to the facility. Currently the SRF from Northacre RRC is transported by road to port and shipped to energy facilities located in Germany and Holland because there is no local energy centre in Wiltshire.

The facility will use gasification technology to generate electricity and the potential for heat making it an energy efficient system. On 17th October 2014, Chinook Sciences announced that it has been selected by Hills as the technology partner for the gasification plant.

A substation will be constructed on-site to enable the electricity produced to be exported to the National Grid, together with possible private underground connections to local businesses.

In August 2015, the public consultation period for the planning application was concluded. The Wiltshire County Council planning committee approved the application on 23rd September. Amberley Consultants acted on behalf of Northacre Renewable Energy for the preparation and submission of the planning application.

In October 2017, Wiltshire Council launched a Wiltshire Waste Strategy Public Consultation, designed to help shape its ten-year strategy, with the Westbury facility being a key component. The consultation period closed on 14th November.

In December 2017, the Hills Group revealed that it plans to apply for amendments to the planning approval which would see:

  • An increase in the height of the chimney from 60 metres to 75 metres;
  • An increase in the height of the buildings to incorporate a more efficient boiler system and to facilitate safe access around the boiler room and plant;
  • The enclosing of the thermal plant to assist in year-round operations and maintenance;
  • The separation of the waste reception building and the thermal building to comply with fire control standards; and
  • One less turbine and a bank of air cooled condensers to make a more efficient system.

The changes have resulted from negotiations between Hills and its engineering procurement and construction contractor and emerging guidance from the Environment Agency on ‘Best Available Technique’ (BAT) for minimising emissions and impacts on the environment.

Northacre Renewable Energy intends to apply for an environmental permit from the Environment Agency in the second quarter of 2018. Construction is expected to start in autumn 2018.

Contact Information

Consultants
Contact Ms Clair Donnelly Phone
Job Title Director Fax
Email [email protected]
 
Company Amberley Consulting
Address 8/10 South Street
PO Box 567
Epsom
Surrey
KT18 7PF
United Kingdom
Phone 44 7920 464988 (mobile)
Fax
Email [email protected]
Web www.amberleyconsulting.com
Contractor/Engineer
Contact Mr Steve Martin Phone 44 779 510 2742 (mobile)
Job Title Business Development Manager Fax
Email [email protected]
 
Company Chinook Sciences
Address No. 1 Nottingham Science Park
Jesse Boot Avenue, University Boulevard
Nottingham
Nottinghamshire
NG7 2RU
United Kingdom
Phone 44 845 094 3001, 44 115 896 8000
Fax 44 845 094 3002
Email [email protected]
Web www.chinookenergy.com
Operator
Contact Mr Mike Webster Phone
Job Title Energy Director Fax
Email [email protected]
 
Company Northacre Renewable Energy
Address Northacre Resource Recovery Centre, Stephenson Road
Westbury
Wiltshire
BA13 4WD
United Kingdom
Phone
Fax
Email [email protected]
Web www.northacrerrc.co.uk
Waste Projects across the world

AcuComm Database Status at 22 Jan 2018

Total number of contacts listed: 17,138

Total number of projects listed: 5733

Number of countries covered: 167

Projects created this quarter: 213

Projects updated this quarter: 503

For sales enquires, please contact Rob Thompson on +44 (0)1243 813696

[email protected]

Learn more to see how AcuComm can benefit you